Case
Index > Case >Typical CasesQingpu Bus Terminal
Sales Products: Capacitor & Reactor Components, Reactive Power Compensation Controller, Capacitor Special Contactor
Project Description: Qingpu District Yinggang Road integrated passenger transport hub project construction site is located in Qingpu District Yinggang Road, Qing Zhao Road junction, the total land area of about 86,580 square meters (including with about 30 acres), of which a land area of land About 21,123 square meters, the land area east of the West to the surplus, south to farmland, west to Qing Zhao Road, north to Ying Hong Kong Road; plot two construction land area of about 46,806 square meters, land to the east by the way, west By the two road, south to Wei Road, north to plan Ying Hong Kong Road. The proposed total construction area of 19,690 square meters (the plot of a proposed construction area of 13,420 square meters, the second block to build a building area of 6270 square meters), construction, including long-distance bus station, parking maintenance and temporary sidewalk and so on. Total investment: 256.11 million yuan.